Back to Manufacturing
Manufacturing

How to create a bill of materials

Define a finished product, its batch size and components with scrap percentages.

2 min read

Watch the demo

A Bill of Materials (BOM) says what goes into making a product. Manufacturing needs Inventory, because components and finished goods are inventory products.

  1. Open Manufacturing and create a BOM.
  2. Choose the finished product and the batch size.
  3. Add the components, each with a scrap %. Component details are read from Inventory.
  4. Set the status: draft, active or archived.

Routing and work centres

To cost labour and overhead, define work centres with a labour rate and an overhead rate per hour, then add operations to the routing. Setup is counted once per order and run time per batch.